Concord Road from Turkey Creek Rd. to Northshore Dr. – TDOT

TDOT and the Town of Farragut are planning a road improvement project along Concord Road.  The project will result in the relocation of over one mile of 8-inch, 12-inch, and 20-inch water mains, as well as multiple large diameter gravity sewer and force main sewer line relocations.  The work is scheduled to be advertised for construction in April 2017, pending scheduling of property acquisition, environmental permitting, railroad coordination, and other logistical challenges.